May 15, 2025
Customized prefabricated cabins were delivered to an industrial energy storage project at a cement plant in Hebei. The cabins accommodate primary power equipment and secondary protection, control and monitoring equipment.
The project layout was developed around the plant’s electrical requirements, equipment arrangement, wiring and maintenance access. The factory’s work covered the design and manufacture of the cabins.
Adapted from the factory’s project update.
